News


Installations

One of the largest single stage compressor installed at a wastewater plant is part of our HV-TURBO® range


Tuesday, 08 December 2020

Share

LinkedIn
Twitter
Facebook

Download

Get our reference pdf


MainImage
 

The list of project related requirements is often long and complex when it comes to delivery of large turbo compressors for big size plants. Our professional and experienced specialists are well known for their ability to provide high-level consulting. In close cooperation with the end-customer, EPC and consultant, from early design to the end of the compressors lifetime, we always strive in finding the best solutions.

 

This was the case at a large site in Germany:

 

A customer contacted us about a compressor installation for a wastewater treatment plant in Berlin. The flow requirement was 85.000Nm³/h and the pressure 1.713 bar(a). During the project period our specialists were in close dialogue with the customer ensuring all project related requirements were taken into consideration. In 1991 we installed a single stage integrally geared compressor, type HV-TURBO KA100SV-GL500, the first delivery of several compressors supplied to this wastewater treatment plant:

 
  • 1991 – one HV-TURBO KA100SV-GL500 with flow 85.000 Nm³/h and the pressure 1.713 bar(a)
  • 1997 – two HV-TURBO KA66SV-GL400 with flow 31.120 Nm³/h and the pressure 1.713 bar(a)
  • 2007 - two HV-TURBO KA100SV-GL500 with flow 85.000 Nm³/h and the pressure 1.713 bar(a)

Latest News

Bright Futures

Howden, A Chart Industries Company, are pleased to announce that we have recently welcomed three S5 students through the Nuffield Research Placements (NRP) programme.
 
The NRP programme provides students with the opportunity to take part in hands-on and engaging research projects. We were motivated to provide students with the opportunity to be involved in making meaningful contributions to the work we do here at Chart Howden.

Technology

Howden, a Chart Industries company, a leading innovator in the engineering and manufacturing industry, hosted an inspiring school visit at their manufacturing facility to celebrate International Women In Engineering Day (INWED) yesterday.

Technology

Howden supplies energy efficient aeration solution to Athlone Wastewater Treatment Works in South Africa.

Bright Futures

Our Bright Futures team in India are providing practical and educational support to local schools, as well as funding essential village infrastructure.

Bright Futures

Connersville hosts charity on a mission to bring opportunity to young people.

Business

Chart Industries and Wolf Carbon Solutions expand MOU on Carbon Capture Utilisation and Storage Projects.

Get our HV-TURBO reference stories pdf

Read about some of the other exciting places you will find a KA Compressor

 

Email Address

First Name

Last Name

 
 

Company

Country

Phone

 

 
 
 

 

 

If you would like to submit an enquiry please get in touch.