Itabo I - Replacement of primary plate heaters

Replacement of primary plate heaters with Howden custom designed rotary air preheaters.

The Itabo I Power Plant, Dominican Republic coal-fired boiler was originally fitted with two plate heat exchangers.

For a period, oil was substituted as the fuel increasing the risk of a heater fire. Fouling and resulting poor thermal performance were also problems affecting the recuperative plate heaters.

By replacing the units with rotary air heaters, we greatly improved thermal performance, increased availability, reduced environmental impact and brought significant savings in operating costs.

Printable PDF/brochure
Itabo case study

The challenge

The plate heaters in the Itabo I Power Plant were installed in 2001. Initially, the unit was designed for coal-fired operation. However, changes in circumstances meant that, for a period, oil was substituted as the fuel. The changes this brought about in the composition of the flue gas led to increased fouling and a serious risk of fire. The heater had previously caught fire twice, and had to be replaced each time.

The loss of availability, fouling and poor thermal performance combined to raise operation costs to an unacceptable level.

Our solution

After thoroughly investigating the operating conditions at the Itabo I plant and the persistent problems the operators were encountering, we concluded that the most efficient, safe and cost effective remedy would be to entirely replace the plate heaters with Howden package rotary air preheaters. Using specially developed software, we can precisely model the conditions under which the air preheater will be working. This allows us to customise the design to match the situation, and very accurately predict the unit's actual performance and behaviour.

For the Itabo I units we recommended our HS elements, using a combination of the HS8 profile which offers excellent thermal performance and the HS9 which brings good cleanability. In this way we ensured the air preheaters had the right balance of characteristics to overcome the problems that the plate heater had encountered.

Semi-retractable soot blowers were fitted to both the hot and cold sides for effective, efficient cleaning. We also fitted a fire detection and fire fighting system to warn of and combat any future outbreak of fires. To minimise leakage over the whole lifetime of the units, we equipped them with fixed sector plates and triple sealing.

A central drive unit was fitted which has a number of advantages over peripheral drives. It offers greater economy, easier installation and replacement, and more straightforward maintenance. It also removes the need for a rack arrangement round the rim of the rotor. This allows the axial seals to run the full length of the rotor, and so helps to minimise leakage. Each air preheater drive also had a second, backup, electric motor.

Rotary air preheaters differ substantially from plate heaters in size and configuration, so it was necessary to redesign and manufacture new ductwork for the units.

To minimise installation costs, the heaters were pre-assembled in the factory. During on-site installation, the new units were positioned alongside the old ones so that the redundant plate heaters could be dismantled and removed while the new rotary units and ducting were being installed. This reduced the overall downtime.

At the request of the Itabo plant operators, the units were pre-assembled at our factory and securely shrink-wrapped before transit, to prevent damage.

Howden package air preheaters

Howden pre-engineered package air preheaters have been subject to continual product development and enhancement over many decades, driven in recent years by the need to reduce fuel consumption and minimise environmental impact. Today they offer remarkable levels of thermal performance, long term reliability, ease of maintenance and cleanability, with very low leakage levels.

Where we are asked to provide a replacement for an existing rotary heater we can almost always match the infrastructure of the old machine, using the same foundations, ductwork, power supplies and other ancillary arrangements. This greatly reduces the cost of the project and the time taken for installation and commissioning. The improved thermal performance and reliability will normally bring sufficient savings in fuel costs and reduced stoppages to recoup the initial investment within a remarkably short time.

The outcome

The new air preheaters have significantly improved the performance of the power station. The HS profile elements are more resistant to fouling and the fire risk has been minimised, so the availability is far higher. The increased thermal performance and reduced leakage has brought valuable savings in fuel consumption, with benefits to both running costs and the environment.

 

Full Case Study

Please complete the fields below to get your copy.

Email Address
First Name
Last Name
Company
 

Full List of Case Study pages

The introduction of Howden's VN seal system to the air preheaters brought an immediate drop in leakage level from 26% to 5%.


Howden completed a retrofit of VARIAX ID fans on the 640MW unit 5 at Asn?s Power Station, Denmark.


The Howden Free Floating Piston is a proven unique technolgy that turns the weakest point to one of the strongest, which removes rider bands wear at a stroke


Berre Petrochemical Cluster, which includes polypropylene and polyethylene plants, trusted Howden to reduce its power costs by 7% within a 3 year return on investment.


VentSim? CONTROL technologies result in impressive cost and energy savings while also raising productivity at Goldcorp Eleonore gold mine.


Fresnillo mine is one of the most technologically advanced deep mines in the world, and incorporates VentSim? CONTROL ventilation management.


UPTIME provides advanced compressor performance analysis at Gunvor Petroleum in the Netherlands


Howden worked with a North American hard rock mine to introduce a Ventilation on Demand system using VentSim? CONTROL technology.


Installing a bigger hub at Herningv?rket, reducing installation costs and future service expenses.


The understanding and knowledge provided by Howden is an essential factor when installing additional equipment on your compressors.


New integrally geared compressor (IGC) results in power savings up to 31MW/h a day


Replacement of primary plate heaters with Howden custom designed rotary air preheaters.


200 bar to 300 bar hybrid compressor retrofit for helium capacity filling


At Millmerran Power Station, Howden provides a tailored service that supports their needs of the plant to prepare for their upcoming major outage.


New boiler and FGD processes called for a total change of the ID booster fan at a power plant in Plzen


Howden develop method to drastically reduce the cylinder repair time of reciprocating compressors.


Upgrade your reciprocating compressor with our innovative coated liner solution.


The introduction of Howden's HC element to the air preheater resulted in extended operational times.


Huge savings were realised by using Howden's turnkey service to reduce heater leakage and running costs.


A large chemical plant on the east coast of the United States contacted Howden to perform a full Turnkey project on their critical path air preheaters.


Howden expertise solves long lasting problems with an axial fan at Uniper's Franken plant.


During the first few months after the deployment of Uptime, VEAS experienced two distinct challenges where the benefits of Uptime were clearly demonstrated.


VentSim? CONTROL case study for three typical mining projects.


Replacement of existing blades at the Wangqu Thermal Power Station


Building the world?s biggest reciprocating compressor - a white paper and video.


Efficient engineering solves impeller failures at the Wibank coalfield.


Centrifugal Fan

At Tarmac (Dunbar cement plant, UK), their existing Raw Mill fan was replaced with an enhanced Howden design in 2007.


If you would like to submit an enquiry please get in touch.

Your local Howden contact

The below contact(s) are the representatives for your country. You can change country below.